Sale!

Construction Site Office

Original price was: ₹275,000.00.Current price is: ₹265,000.00.

ISO-grade Corten steel container office for EPC and infrastructure project sites. Crane-placed on compacted ground. MCB panel and generator socket included. Delivered Pan India in 7–21 working days.
Size
20 ft or 40 ft
Capacity
4–6 or 8–12 people
Frame
IS 2062 Corten Steel
Electrical
MCB + DG Socket
Price
From ₹3,20,000
Delivery
7–21 working days
Foundation
Gravel pad, no slab
Relocations
Crane-liftable ISO

 

Product Overview

Detailed information about Construction Site Office

Construction Site Office — ISO Container Units for Active Project Sites

Your construction project starts next month. Your engineers need a working office at the site, and permanent construction is not an option. A construction site office from us is an ISO-grade Corten steel container — crane-placed, electrical-fitted, and ready to use within 1 to 2 days of delivery. Built for project sites. Not a cabin.

A 20-ft construction site office installed at an active highway construction corridor — two engineers review drawings and site data outside the unit. Excavator and batching plant in operation behind.

Sizing for Your Site Team — Which Unit Handles Your Project

A 20-ft unit gives you 5,500mm × 2,200mm of usable floor space. That fits 4 to 6 engineers at desks with room for a drawing review table in the centre. It loads on a flat-bed truck and cranes into position in under 2 hours.

A 40-ft unit gives you 11,800mm × 2,200mm. Use it for 8 to 12 people — or split the floor between a working area and a dedicated site meeting zone. Useful when your project has a project manager, a site engineer team, and a records section all working from the same base.

A 40-ft construction site office serving a multi-function engineering team at an urban infrastructure project — project manager, site engineers, and records team operating from a single unit inside a green site compound.

If you need separate rooms within the unit — a partition wall between a manager’s desk and an open plan area — that is a factory decision, not a site decision. Our prefabricated container office page covers what your team must confirm before fabrication starts.

Ground Preparation — Foundation for an Undeveloped Site

You do not need a concrete slab. Four levelling pads on compacted ground are sufficient for a single unit.

Here is what to confirm before the container arrives:

Ground must be compacted. Loose soil, wet ground after monsoon, or recently filled earth will not hold the pad positions. A vibro-compacted gravel base of 150–200mm at each of the four pad positions is standard preparation for a highway, dam, or power project site.

The crane needs a clear swing radius of at least 8 metres around the placement position. The delivery truck needs access within 20 metres of the final position.

If your site has no crane arranged, tell us. We can coordinate crane availability if you provide the site location and access conditions at the order stage.

40-ft construction site office deployed at a high-altitude hydropower project site in Himachal Pradesh — crane-placed on compacted scree beside a glacial river, running on a diesel generator, serving the engineering team at one of India’s most remote active construction sites.

For full specifications on the ISO container format we supply across all project types, see our container office page.

If your site team is 4 people or fewer on a project under 12 months, a lighter and faster option may serve you better. Our porta cabin site office is quicker to deploy and lower cost for shorter projects.

Request a Quote for Your Construction Site Office

Tell us: project type (highway / dam / metro / power), team size, project duration in months, site location (state and approximate distance from nearest town), and your required delivery date.

We will respond with a unit specification and price within 24 hours.

Frequently Asked Questions

What size construction site office suits a team of 10 engineers?

A 40-ft unit suits 10 engineers — it gives 11,800mm × 2,200mm of usable floor and can hold separate desk zones and a central drawing review area. If the 10 engineers work across two shifts, a 20-ft unit may be adequate.

What ground preparation is needed before the container is placed?

A vibro-compacted gravel base of 150–200mm at the four levelling pad positions is sufficient on an undeveloped project site. You do not need a concrete slab for a ground-level single unit. Loose or recently filled soil needs compaction before delivery.

Can the construction site office run on a diesel generator without grid supply?

Yes, with a generator input socket and earth rod provision factory-fitted at the order stage. The standard electrical fitout is grid-ready. The DG additions must be specified before fabrication — they cannot be added after the unit is delivered.

How long does it take to relocate the office when the project phase moves?

Relocation takes 4 to 6 hours at each end — crane-off the pads, transport by flat-bed, crane-on at the new position. The MCB panel disconnects cleanly with no rewiring. Most 18 to 24 month projects complete one or two relocations.

Shopping Cart
Close
Scroll to Top